Send Message
Home > products > Cementing Plug >
Oil And Gas Well Cementing Plug PDC Drillable Top Plug Cementing

Oil And Gas Well Cementing Plug PDC Drillable Top Plug Cementing

Oil And Gas Well Cementing Plug

Cementing Plug PDC Drillable

PDC Top Plug Cementing

Place of Origin:

CHINA

Brand Name:

SWS

Contact Us

Request A Quote
Product Details
Name:
Cementing Plug
Type:
Top Or Bottom Plug
Advantage:
Anti Rotation
Advantage2:
Floatation Control Value
Function:
PDC Drillable
Structure:
Non-rotational
Product Description

5 1/2 Standard Cementing Plug For Well Cementing,Oil Rig Equipment, Drilling Special Tools Cementing Plug

 

 

Cementing plugs are used to remove the mud during cementing operations.
Top cementing plugs and bottom cementing plugs are used in the cementing process. The top and bottom
cementing plus general have different colors (bottom plugs are red and top plugs are black) in
production for easy usage in operation.
 
The top cementing plug has a solid body that provides positive indication of contact with
cementing floating collar and bottom plug through an increase in pump pressure.
 
The bottom cementing plug with a hollow body is installed ahead of the cement slurry to
minimize contamination by fluids inside the casing prior to cementing.
 

Non-Rotary Cementing/Wiper Plugs (Polyurethane)
This plug is used to separate the cement slurry from other fluids, reduce contamination, and maintain predictable slurry
performance and to clean various waste in the wall of the casing. Two types of cementing plugs are typically used on a cementing operation. The bottom plug is launched ahead of the cement slurry to minimize contamination by fluids inside the casing prior to cementing. A diaphragm in the plug body ruptures under 250~400psi easily to allow the cement slurry to pass through after the plug reaches the landing collar. The top plug has a solid body that provides positive indication of contact with the landing collar and bottom plug through an increase in pump pressure. This plug is tested strictly every batch by pressure chambers at different required pressure and temperature.

 

ADVANTAGES AND MAIN FEATURES

 

Non-rotating cementing plugs are designed to decrease the drill out times. Reinforced locking teeth are
built into the plugs, which lock together between the plug and the float equipment to eliminate rotation
of the plug during drill out. The top cementing plug are latched to the anti-rotational float collar.
 
Performance features
› Non-rotational.
› Decrease drill out time.
› PDC drillable.
 
Options
› Available in sizes from 4-1/2" to 20".
› Available in NR, SBR, NBR and HNBR grades.
 
 
Oil And Gas Well Cementing Plug PDC Drillable Top Plug Cementing 0
 
Oil And Gas Well Cementing Plug PDC Drillable Top Plug Cementing 1

 

Casig size inch Casing weight range O.D. of rubber cup Working Temperature Working pressure mpa burst pressure mpa hardness
4-1/2. 14.14-17.26 kg/m 9.5-11.6 lb/ft 110mm 4.331inch (-30℃-150℃) ≥15mpa 1-2mpa 75-95
5 17.11-35.86 kg/m 11.5-24.1 lb/ft 122mm 2.803inch (-30℃-150℃) ≥15mpa 1-2mpa 75-95
5-1/2. 20.83-39.88 14-26.8 135 5.315 (-30℃-150℃) ≥15mpa 1-2mpa 75-95
7 25.3-56.55 17-28 170 6.693 (-30℃-150℃) ≥15mpa 1-2mpa 75-95
7-5/8. 35.72-63.69 24-42.8 185 7.283 (-30℃-150℃) ≥15mpa 1-2mpa 75-95
9-5/8. 53.57-79.62 36-53.5 235 9.252 (-30℃-150℃) ≥15mpa 1-2mpa 75-95
10-3/4. 60.27-97.77 40.5-65.7 260 10.236 (-30℃-150℃) ≥15mpa 1-2mpa 75-95
13-3/8. 71.43-107.15 48-72 333 13.110 (-30℃-150℃) ≥15mpa 1-2mpa 75-95
20 139.89-197.93 94-133 498 19.606 (-30℃-150℃) ≥15mpa 1-2mpa 75-95
Q1. How to get an accurate quotation?
A1: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output,
Q2. What if I use this machine for the first time and know nothing of it ?
A2: We will have our engineers teach you how to operate it,you can just inform us some details of the product you need then we can customize as your special order.
Q3. How does your factory do regarding quality control?
A3: We has been regard quality as the priority. We always attach great importance to quality controlling from the very beginning to the very end ,so our press can match all the CE and ISO standard also more strict standard .
Q4. How about your delivery time?
A4: Generally, it will take 35 working days after receiving your deposit payment. The specific delivery time depends on the items and the quantity of your order. Sometimes we have standard machines in stock.
Q5. What is the warrantee period of the machine?
A5: We can supply 1 year warranty for our machines, We can send engineer to customer place if big quality problem. We can provide internet or calling service at any time.
Q6. after-sales service
A6: 1. Installation:Free installation and commissioning, travel expense is on foreign customer.(Including round ticket and
accommodation cost)
2. Personnel training: Our engineers will give your employees free machine training when they come to your company to assemble the machines, and welcome to our factory to learn how to operate our machineQ1. How to get an accurate quotation?
.
 
 

 

 

 

Send your inquiry directly to us

Privacy Policy China Good Quality Cementing Float Equipment Supplier. Copyright © 2023-2024 jssws-oil.com . All Rights Reserved.